4511 FEASIBILITY STUDY REPORTS
(Revised 03/06)
As required by SAM, a feasibility study may be required prior to the encumbrance or expenditure of funds on defined information technology projects. If an information technology project also incorporates public safety communications services or equipment, a copy of the FSR should be sent to OPSCS at the same time as the original is submitted for approval per SAM.
Details on submitting copies of the FSR to OPSCS can be found in the PSCSG.